Home additions in Bountiful & Davis County Design, engineering, permits and construction Call (801) 546-8180
Two-story home on a large lot with an added garage wing and room above in matching siding and stone

Areas we serve: Kaysville

Home Additions in Kaysville

Kaysville runs its building permits through an online portal with published checklists, including one for additions. Here is how the process works and what shapes an addition in the city.

Adding on in Kaysville

Kaysville sits between Farmington and Layton. Many homeowners here have lots with room to grow and houses that no longer match the size of the household. Whether the answer is a family room, a suite for a parent or a larger garage, the process starts the same way: confirm what the lot allows, then design to it.

Who reviews your addition

Kaysville's Building Department issues permits in the city. The city states that building permits are required on new construction, remodels and repairs, and it lists additions specifically, along with electrical, mechanical and plumbing work.

How to apply
Online building permit portal on CityInspect; an account is required first
Review order
Applications reviewed in the order received
Review time
Most permits take approximately two weeks, per the city
Fees
Non-refundable application fee as a deposit; remaining fees paid at permit issuance

The online process

The CityInspect platform tracks plan review and inspections for the project, handles payments and lets you print the issued permit. The Building Department offers help if setting up the account is a problem. Because review happens in the order received, submitting a complete package the first time is the easiest way to keep the project moving. See home addition plans.

The additions checklist

Kaysville's building permits page lists additions among the projects with a published checklist, alongside separate checklists for remodels, basement finishes, decks and accessory buildings. We work from the current checklist while the drawings are prepared, which avoids resubmission. Detached garages and sheds follow the city's accessory building rules instead, including a published guide to where they may sit and how tall they may be.

Retaining walls and site work

The city lists retaining walls more than four feet tall, measured from the bottom of the footing to the top of the wall, among work that needs a permit. On a lot with any grade change, an addition that needs a retaining wall should include it in the plans from the start. See does an addition need an engineer?

Internal accessory dwelling units

Kaysville has a page dedicated to internal accessory dwelling units. If your addition is meant to create separate living space for a parent or adult child, review the city's ADU requirements early, because they can affect layout, entrances and parking. See in-law suite additions.

Planning the schedule

Because Kaysville reviews applications in the order received and most take about two weeks, the time before submittal matters most. Design, any structural engineering and a complete package should be ready before you join the queue. If you want to build in spring or summer, that usually means finishing design during the winter.

Additions that suit Kaysville homes

Design that fits the neighborhood

On larger lots, it can be tempting to build as big as the setbacks allow. The best additions still relate to the scale and style of the original house, so the result looks like one home rather than two buildings. See matching the existing home and how big can my addition be?

Questions to ask before you design

  1. What are the zone's setbacks, height and coverage limits?
  2. Does the addition include a separate living unit?
  3. Will there be retaining walls over four feet?
  4. Is there an HOA with design review?
  5. Is the submittal complete against the city's additions checklist?

Nearby, see Farmington and Layton, or all of Davis County.

Kaysville questions

How do I apply for a building permit in Kaysville?

Kaysville takes plans through its online building permit portal on CityInspect. You create an account before applying, and the same platform tracks plan review and inspections and takes payments.

How long does Kaysville take to review a permit?

The city says applications are reviewed in the order received and most permits take approximately two weeks for review. Larger or incomplete submittals can take longer.

Is there an upfront fee?

Kaysville charges a non-refundable application fee when you apply, which counts as a deposit toward the total building fees. The remaining fees are paid when the permit is issued.

Make room in your Kaysville home

Tell us about the house and the space you need.

See What's Possible With Your Home